Services

Compliance services for facilities programs

Core offerings for portable equipment, RCDs, exit & emergency lighting, and three-phase plug-in plant. Construction and fire equipment services are omitted until capability is confirmed.

01 · AS/NZS 3760:2022

PAT / plug-in equipment

Visual inspection and electrical testing of single-phase (and flexible-lead) equipment — tools, leads, power boards, office and kitchen appliances — by competent persons using calibrated PAT testers.

  • Visual inspection first — most defects are found here
  • Earth continuity, insulation resistance, polarity where applicable
  • Durable pass tags with test and retest dates
  • Fail / out-of-service tagging and site notification
PAT testing

Inspect & test

In accordance with AS/NZS 3760:2022

02 · RCD

RCD / safety switch testing

Instrument trip-time testing of residual current devices as part of your electrical safety program — distinct from a simple push-button user check.

  • Trip-time measurement against expected Type I / Type II criteria
  • Tagging and recording of outcomes
  • Aligned to AS/NZS 3760 and applicable state electrical safety requirements
Pass tag close-up

Evidence on the cord

Tags your auditors can read at a glance

03 · AS/NZS 2293.2

Exit & emergency lighting

Discharge testing and inspection of exit signs and emergency luminaires under AS/NZS 2293.2 — typically a six-monthly core test with records per fitting.

  • Simulate mains failure / discharge for rated duration (typically 90 minutes)
  • Inspect fittings, batteries, charging and obstructions
  • Logbook-style records for building compliance

Exit and emergency lighting is not portable appliance testing. Circuit isolation may require a licensed electrical worker — we coordinate accordingly.

Exit discharge test

Discharge tests

Exit & emergency under 2293.2

04 · 3 Phase

Three-phase plug-in plant

Testing of three-phase equipment connected by flexible lead and plug — welders, compressors and similar plant — using 3-phase adapters and competent persons.

  • Within AS/NZS 3760 scope for flexible-lead equipment
  • Fixed hard-wired installations remain electrician / Wiring Rules territory
  • Ideal for workshops, plant rooms and industrial FM contracts
3-phase plant

Industrial plant

Plug-in 3-phase — not hard-wired installs

Need a multi-service visit?

Bundle PAT, RCD, exit/emergency and 3-phase into one scheduled attendance where it suits your sites.